top of page
Pangea Biological logo in blue text for Pangea and in olive green text for Biological, showing partial rings at bottom of world

SDG&E EAST COUNTY SUBSTATION PROJECT

Built by San Diego Gas & Electric (SDG&E), the East County (ECO) Substation Project was undertaken to improve reliability and harness renewable energy generated in San Diego and Imperial Counties in order to meet projected electrical load requirements for southern California. The project involved construction of the ECO Substation, rebuilding of the existing Boulevard Substation, looping of the existing 500 kV Southwest Powerlink transmission line into the new ECO Substation, and connecting the new ECO Substation with the upgraded Boulevard Substation.

 

Pangea provided comprehensive environmental compliance support to SDG&E’s engineering and construction contractor, Beta Engineering.

© 2025 by Pangea Biological

 

All rights reserved. No portion of this website may be reproduced or utilized in any form — written, electronic, recording, or photocopying — without prior written permission from the copyright owner, except for brief excerpts in critical reviews or articles where specific consent has been granted by the owner.

bottom of page